DocumentCode
1325501
Title
A Systematic Method for Constructing Feasible Solution to SCUC Problem With Analytical Feasibility Conditions
Author
Wu, Hongyu ; Guan, Xiaohong ; Zhai, Qiaozhu ; Ye, Hongxing
Author_Institution
SKLMSE Lab., Xi´´an Jiaotong Univ., Xi´´an, China
Volume
27
Issue
1
fYear
2012
Firstpage
526
Lastpage
534
Abstract
Obtaining high-quality feasible solution is the core and the major difficulty in solving security-constrained unit commitment (SCUC) problems. This paper presents a systematic method for constructing feasible solutions to SCUC problem based on a group of analytical feasibility conditions. The feasibility check is performed based on the analytical necessary conditions such that most of infeasible UC states can be identified without solving LP problem. If a UC state is infeasible, it is adjusted with the possibly minimal operating cost increase based on the cost information. This UC adjusting issue is formulated as a zero-one programming problem and a branch and bound (B&B) method is established based on these feasibility conditions. Numerical testing is performed for a 31-bus system, an IEEE 24-bus system, and an IEEE 118-bus system. The testing results suggest that over 95% of infeasible UC states are identified by the analytical necessary conditions. The near-optimal feasible schedules for SCUC problem can be obtained efficiently by the proposed method. The feasible schedules obtained are compared with those obtained from mixed integer programming-based method in the IEEE 118-bus system. It is shown that the new method can produce competitive results in terms of solution quality and computational efficiency.
Keywords
IEEE standards; integer programming; power generation dispatch; power generation scheduling; tree searching; 31-bus system; IEEE 118-bus system; IEEE 24-bus system; LP problem; SCUC problem; UC states; analytical feasibility conditions; branch and bound method; cost information; high-quality feasible solution; mixed integer programming-based method; near-optimal feasible schedules; security-constrained unit commitment problems; zero-one programming problem; Power transmission lines; Schedules; Security; Spinning; Systematics; Testing; Transmission line matrix methods; Generation scheduling; Lagrangian relaxation; mixed integer programming; security constrained unit commitment;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/TPWRS.2011.2165087
Filename
6024477
Link To Document