• DocumentCode
    1330986
  • Title

    Electric power consumption on the electrified Rocky Mountain and Missoula divisions of the Chicago, Milwaukee, & St. Paul railway

  • Author

    Beeuwkes, Reinier

  • Author_Institution
    C. M. & St. P. Railroad, Seattle, Wash.
  • Volume
    39
  • Issue
    9
  • fYear
    1920
  • Firstpage
    813
  • Lastpage
    818
  • Abstract
    POWER for the electrical operation of the Chicago, Milwaukee & St. Paul Railway, between Harlowton, Mont. and Avery, Ida., is delivered to the transmission system of the Railway in the form of 100,000-volt, three-phase, 60-cycle current. The power is supplied under two separate contracts, one for the Rocky Mountain Division, extending from Harlowton to Deer Lodge, and the other for the Missoula Division, extending from Deer Lodge to Avery.
  • Keywords
    Companies; Limiting; Power demand; Rail transportation; Rails; Substations; Switches;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Journal of the
  • Publisher
    ieee
  • ISSN
    0360-6449
  • Type

    jour

  • DOI
    10.1109/JoAIEE.1920.6594296
  • Filename
    6594296