DocumentCode
1330986
Title
Electric power consumption on the electrified Rocky Mountain and Missoula divisions of the Chicago, Milwaukee, & St. Paul railway
Author
Beeuwkes, Reinier
Author_Institution
C. M. & St. P. Railroad, Seattle, Wash.
Volume
39
Issue
9
fYear
1920
Firstpage
813
Lastpage
818
Abstract
POWER for the electrical operation of the Chicago, Milwaukee & St. Paul Railway, between Harlowton, Mont. and Avery, Ida., is delivered to the transmission system of the Railway in the form of 100,000-volt, three-phase, 60-cycle current. The power is supplied under two separate contracts, one for the Rocky Mountain Division, extending from Harlowton to Deer Lodge, and the other for the Missoula Division, extending from Deer Lodge to Avery.
Keywords
Companies; Limiting; Power demand; Rail transportation; Rails; Substations; Switches;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Journal of the
Publisher
ieee
ISSN
0360-6449
Type
jour
DOI
10.1109/JoAIEE.1920.6594296
Filename
6594296
Link To Document