• DocumentCode
    1331932
  • Title

    Rates for electrical energy and service

  • Author

    Bailey, F.W.C.

  • Author_Institution
    Columbus, Ohio
  • Volume
    40
  • Issue
    10
  • fYear
    1921
  • Firstpage
    803
  • Lastpage
    808
  • Abstract
    With the fact that nearly 500 bituminous coal mines in this vicinity are served wholly or in part by central station power service, this discussion of power rates has been prepared principally for the A. I. M. E. members, assuming that the members of the A. I. E. E. section of this joint meeting are more or less familiar with the various forms of rate schedules.
  • Keywords
    Coal; Companies; Contracts; Cost accounting; Reactive power; Schedules;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Journal of the
  • Publisher
    ieee
  • ISSN
    0360-6449
  • Type

    jour

  • DOI
    10.1109/JoAIEE.1921.6594448
  • Filename
    6594448