DocumentCode :
1332316
Title :
More effective engineering proposals — One key to success
Author :
Evans, Frank W.
Author_Institution :
U.S. Navy, NAPECO Naval Weapons Plant, Washington 25, D.C.
Volume :
3
Issue :
2
fYear :
1960
fDate :
7/1/1960 12:00:00 AM
Firstpage :
54
Lastpage :
58
Abstract :
A review is made of the importance and significance of the technical communication in engineering R & D contract proposals. This paper shows what the Services are seeking in contracts with engineering firms and outlines the basic elements that the proposal should contain. Procedures for evaluating finished proposals are discussed, and a number of specific reasons are given for rejecting proposals. General recommendations are given for effectively shaping the material in an engineering proposal.
Keywords :
Companies; Contracts; Hardware; Personnel; Production; Proposals; Reliability;
fLanguage :
English
Journal_Title :
Engineering Writing and Speech, IRE Transactions on
Publisher :
ieee
ISSN :
0893-7869
Type :
jour
DOI :
10.1109/TEWS.1960.6594511
Filename :
6594511
Link To Document :
بازگشت