DocumentCode :
1335500
Title :
A Two-Phase Heuristic for the Production Scheduling of Heavy Plates in Steel Industry
Author :
Tang, Lixin ; Wang, Xianpeng
Author_Institution :
Liaoning Key Lab. of Manuf. Syst. & Logistics, Northeastern Univ., Shenyang, China
Volume :
18
Issue :
1
fYear :
2010
Firstpage :
104
Lastpage :
117
Abstract :
In this paper, the production scheduling of heavy plates is considered. Different from general hot rolling mill, the reheating furnace scheduling shares the same importance with the hot rolling scheduling due to the special characters of heavy plates such as the large differences in weight and dimension. One major characteristic of the reheating furnace is that it can simultaneously process multiple slabs. When the furnace is full, a slab can be drawn in only if the head slab in the furnace has been drawn out. Therefore, the practical heating time of a slab is variable and besides the weight and dimension, is also dependent on not only the slab heating sequence but also the furnace capacity. Since there is no buffer between the reheating furnace and the hot rolling line, a finished slab will reside in the furnace until the hot rolling line is available. To solve this problem, a two-phase heuristic is proposed. In the first phase, only the hot rolling scheduling problem is considered and a scatter search is developed for it. In the second phase, a decision tree-based heuristic is constructed to obtain the corresponding reheating furnace schedule. The experimental results on real production data show that the two-phase heuristic outperforms the current manual scheduling system.
Keywords :
decision trees; furnaces; heating; hot rolling; plates (structures); scheduling; search problems; slabs; steel industry; decision tree-based heuristic; furnace capacity; heating sequence; heavy plates; hot rolling scheduling; production scheduling; reheating furnace scheduling; scatter search; slab; steel industry; two-phase heuristic; Decision tree-based heuristic; heavy plate; hot rolling scheduling; reheating furnace scheduling; scatter search;
fLanguage :
English
Journal_Title :
Control Systems Technology, IEEE Transactions on
Publisher :
ieee
ISSN :
1063-6536
Type :
jour
DOI :
10.1109/TCST.2009.2014960
Filename :
5337884
Link To Document :
بازگشت