Title :
On Internal Variable Assignments for Sequential Switching Circuits
Author :
Bianchini, R. ; Freiman, C.
Author_Institution :
Ford Instrument Co., New York, N. Y.
fDate :
3/1/1961 12:00:00 AM
Keywords :
Circuit testing; Laboratories; Power supplies; Switching circuits; Timing;
Journal_Title :
Electronic Computers, IRE Transactions on
DOI :
10.1109/TEC.1961.5219161