Title :
2-Unit Redundant Systems with Replacement & Repair
Author :
Skákala, J. ; Rohav-Ilkiv, B.
Author_Institution :
CSc.; Slovenska Vysoká ¿kola Technická; Nositel´´ka Radu Republiky; StrojnÃ\xadcka fakulta; 88031 Bratislava; Gottwaldovo námestie ¿. 17 CZECHOSLOVAKIA
Abstract :
The paper deals with redundant systems consisting of i.i.d. units with repair. There are 2 kinds of spare units 1) warm standby units with instant perfect replacement and 2) cold stock units which can be supplied after a delay only. The replacement mechanism and the derivation of the mean ´time to first system failure´ (TFSF) using Markov renewal processes are illustrated on two models. The influence of stock unit replacement time on the mean TFSF is studied.
Keywords :
Delay effects; Exponential distribution; Failure analysis; Finishing; Instruments; Materials requirements planning; Redundancy; Reliability theory; Signal analysis; Signal processing; 2-unit redundancy; Standy spare; Stock spare;
Journal_Title :
Reliability, IEEE Transactions on
DOI :
10.1109/TR.1977.5220163