• DocumentCode
    1344572
  • Title

    Improvement of Supervision Schedules for Protective Systems

  • Author

    Inagaki, Toshiyuki ; Inoue, Koichi ; Akashi, Hajime

  • Author_Institution
    Dept. of Precision Mechanics; Faculty of Engineering; Kyoto University; Kyoto 606 JAPAN.
  • Issue
    2
  • fYear
    1979
  • fDate
    6/1/1979 12:00:00 AM
  • Firstpage
    141
  • Lastpage
    144
  • Abstract
    Improvement of supervision schedule is considered for protective-systems of multiple components. Each component is periodically supervised. Our improvement procedure consists of two steps. 1) Determine the time length of supervision and duration of successive supervisions which maximize the minimum point availability for simultaneous supervision schedule where all components are supervised simultaneously. 2) Improve the supervision schedule of Step 1 by constructing a staggered supervision schedule. In this schedule components are divided into subgroups, and supervisions of subgroups are staggered while components in the same subgroup are supervised simultaneously. A systematic method is given to optimize allocating components into subgroups for a specified number of subgroups and staggering of supervisions. An example illustrates the method.
  • Keywords
    Cost function; Disaster management; Hazards; Linear programming; Maintenance; Markov processes; Mathematical programming; Optimization methods; Protection; Redundancy; Grouping of components; Protective system; Simultaneous and staggered supervision schedule;
  • fLanguage
    English
  • Journal_Title
    Reliability, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9529
  • Type

    jour

  • DOI
    10.1109/TR.1979.5220525
  • Filename
    5220525