DocumentCode
1344572
Title
Improvement of Supervision Schedules for Protective Systems
Author
Inagaki, Toshiyuki ; Inoue, Koichi ; Akashi, Hajime
Author_Institution
Dept. of Precision Mechanics; Faculty of Engineering; Kyoto University; Kyoto 606 JAPAN.
Issue
2
fYear
1979
fDate
6/1/1979 12:00:00 AM
Firstpage
141
Lastpage
144
Abstract
Improvement of supervision schedule is considered for protective-systems of multiple components. Each component is periodically supervised. Our improvement procedure consists of two steps. 1) Determine the time length of supervision and duration of successive supervisions which maximize the minimum point availability for simultaneous supervision schedule where all components are supervised simultaneously. 2) Improve the supervision schedule of Step 1 by constructing a staggered supervision schedule. In this schedule components are divided into subgroups, and supervisions of subgroups are staggered while components in the same subgroup are supervised simultaneously. A systematic method is given to optimize allocating components into subgroups for a specified number of subgroups and staggering of supervisions. An example illustrates the method.
Keywords
Cost function; Disaster management; Hazards; Linear programming; Maintenance; Markov processes; Mathematical programming; Optimization methods; Protection; Redundancy; Grouping of components; Protective system; Simultaneous and staggered supervision schedule;
fLanguage
English
Journal_Title
Reliability, IEEE Transactions on
Publisher
ieee
ISSN
0018-9529
Type
jour
DOI
10.1109/TR.1979.5220525
Filename
5220525
Link To Document