DocumentCode :
134644
Title :
Optimizing the generator start-up sequence after a power system blackout
Author :
Cong Shen ; Kaufmann, Paul ; Braun, Martin
Author_Institution :
Energy Manage. & Power Syst. Oper. Dept., Univ. of Kassel, Kassel, Germany
fYear :
2014
fDate :
27-31 July 2014
Firstpage :
1
Lastpage :
5
Abstract :
The restoration process of a power system after a blackout consists of three phases, namely starting up the generators, re-energizing the network, and picking the loads. The generator start-up sequence is pivotal for the total restoration time and the following restoration steps. In this paper, a novel algorithm for optimizing a generator start-up sequence is proposed. Based on the VIKOR method, which is a multi-objective approach, the proposed algorithm is not only able to improve the start-up time and reliability of a generator start-up sequence, but can also handle auxiliary optimization criteria with priorities that change during the start-up. Such criteria are, for instance, the importance of the power increasing rate, reliability and surrounding topologies of generators. The efficiency of the proposed method is evaluated in two tests. In the first test exhaustive search is used to compute optimal solutions. In the second and larger test NSGA-II is utilized to approximate the Pareto frontier. For both tests the proposed algorithm approximates the reference results while being computationally very efficient. This makes it suitable for online decision making where a new startup sequence has to be computed in a few seconds or minutes.
Keywords :
electric generators; genetic algorithms; power system reliability; power system restoration; sorting; NSGA-II; Pareto frontier; VIKOR method; auxiliary optimization criteria; first test exhaustive search; generator start-up sequence optimization; generator start-up sequence reliability; generator topology; multiobjective approach; online decision making; power increasing rate; power system blackout; power system restoration process; Generators; Indexes; Performance analysis; Power system reliability; Reliability; Vectors; Analytic Hierarchy Process (AHP); Generator Start-Up Sequence; Network Restoration; Performance Index; VIKOR Algorithm;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
PES General Meeting | Conference & Exposition, 2014 IEEE
Conference_Location :
National Harbor, MD
Type :
conf
DOI :
10.1109/PESGM.2014.6938799
Filename :
6938799
Link To Document :
بازگشت