• DocumentCode
    1347407
  • Title

    Rapid transit progress in Toronto

  • Author

    Inglis, J. G.

  • Author_Institution
    Toronto Transit Commission, Toronto, Ont., Canada
  • Volume
    75
  • Issue
    6
  • fYear
    1957
  • Firstpage
    352
  • Lastpage
    354
  • Abstract
    CANADA´S first subway began operating in Toronto on March 30, 1954. In the first 2 years of operation it has carried about 144,000,000 passengers and its cars have travelled about 12,000,000 miles. So successful has it been that the initial order of 106 cars is being increased over 30% (per cent) by an order for 34 more. Their arrival during the coming summer will permit the system to operate at its ultimate designed capacity of 40,000 passengers per hour in each direction. Its popularity with the riding public has created an urgent demand for a second subway and has proved the advantages of rapid transit in one more metropolitan area.
  • Keywords
    Cities and towns; Color; Furnaces; Lighting; Transportation; Voltage fluctuations; Voltage measurement;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Part II: Applications and Industry, Transactions of the
  • Publisher
    ieee
  • ISSN
    0097-2185
  • Type

    jour

  • DOI
    10.1109/TAI.1957.6367258
  • Filename
    6367258