Title :
Operational Availability of a Complex System with Two Types of Failure under Different Repair Preemptions
Author :
Gupta, P.P. ; Kumar, Anil
Author_Institution :
Dept. of Mathematics; M.M. College; Modinagar, INDIA. P.P. Gupta: For biography, see vol R-25, 1976 Apr, p 40.
Abstract :
Operational availability of a complex system with two subsystems is discussed. The failure and repair times of units for both subsystems follow exponential and general distributions, respectively. ´Inclusion of supplementary variable´ technique and Laplace transforms have been used to obtain transient-state probabilities. Some numerical results highlighting the effect of various failures on long-run availability of the system have been computed. Derivations are in a separately available Supplement.
Keywords :
Availability; Degradation; Difference equations; Hazards; Markov processes; Mathematical model; Operations research; Research and development; Stochastic systems; Switches; Head-of-line; Opportunistic repair; Preemptive-repeat; Preemptive-resume; Redundancy;
Journal_Title :
Reliability, IEEE Transactions on
DOI :
10.1109/TR.1981.5221184