• DocumentCode
    1348637
  • Title

    Cost Effectiveness of Introducing Standby Into A Production System

  • Author

    Venkateswarlu, P. ; Kochar, Inderpal Singh

  • Author_Institution
    Lecturer; National Institute for Training in Industrial Engineering; Vihar Lake Rd, Bombay-400 087 INDIA.
  • Issue
    1
  • fYear
    1982
  • fDate
    4/1/1982 12:00:00 AM
  • Firstpage
    121
  • Lastpage
    122
  • Abstract
    A systematic method is proposed to compare the investment in a standby for a crucial equipment in a production system and the anticipated benefits therefrom. The anticipated benefits take into account the cost of repairs, switching, operation, maintenance, and lost production. A method is proposed to identify the most economic mode of operation of the standby system.
  • Keywords
    Control charts; Costs; Industrial training; Investments; Lakes; Production systems; Reliability engineering; Sampling methods; Statistics; Testing; Present value; Production cost; Standby system;
  • fLanguage
    English
  • Journal_Title
    Reliability, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9529
  • Type

    jour

  • DOI
    10.1109/TR.1982.5221258
  • Filename
    5221258