Title :
Operation of two alternating current stations through parallel circuits, and the distribution of load and wattless currents between them
fDate :
3/1/1912 12:00:00 AM
Abstract :
Two or more alternating current generating stations may be operated in parallel through the medium of several transmission circuits to which the load is independently connected at intermediate points. This method of operation possesses advantages from the power house standpoint as it offers a choice of the units at two stations in carrying the load and therefore provides greater reliability of service and a more flexible and economical distribution of the load.
Keywords :
Bars; Force; Generators; Power transmission lines; Reactive power; Resistance; Vectors;
Journal_Title :
American Institute of Electrical Engineers, Proceedings of the
DOI :
10.1109/PAIEE.1912.6659624