DocumentCode :
1351720
Title :
Optimum Preventive Maintenance Policies for a Computer System with Restart
Author :
Nakagawa, Toshio ; Nishi, Kenjiro ; Yasui, Kazumi
Author_Institution :
Department of Mathematics; Meijo University; Nagoya 468 JAPAN.
Issue :
4
fYear :
1984
Firstpage :
272
Lastpage :
276
Abstract :
This paper considers a computer system where an operation is restarted when the system stops on some faults. The restart does not succeed every time. Three preventive maintenance (pm) models are considered: A) The pm is made at the scheduled time T. B) The pm is made at the K-th successful restart. C) The pm is made at the next scheduled time if the total number of successes of restart exceeds K. The availabilities of each model are obtained and the optimum pm policies are discussed.
Keywords :
Art; Calculus; Error correction; Hazards; Power system modeling; Preventive maintenance; Probability; Processor scheduling; Stochastic systems; Temperature; Availability; Computer system; Optimum policy; Preventive maintenance;
fLanguage :
English
Journal_Title :
Reliability, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9529
Type :
jour
DOI :
10.1109/TR.1984.5221819
Filename :
5221819
Link To Document :
بازگشت