DocumentCode
1354812
Title
R&M 2000 ߞ Coequality Between R&M, Cost, Performance, and Schedule
Author
Jaquess, Robert A.
Author_Institution
Martin Marietta Denver Aerospace; POBox 179; Denver, Colorado 80201 USA.
Issue
3
fYear
1987
Firstpage
331
Lastpage
334
Abstract
The US Air Force R&M 2000 Action Plan makes R&M equal to technical performance and schedule in source selection, proposal evaluation and contract performance. This paper discusses that coequality. R&M 2000 provides an opportunity for the practitioners to achieve a new high water mark in technology by institutionalizing the objectives toward a common cause.
Keywords
Associate members; Contracts; Costs; Design engineering; Human factors; Job shop scheduling; Logistics; Maintenance engineering; Proposals; Reliability engineering; Coequality; Cost avoidance; Double-R/Half-M; Maintainability; R&M 2000 Action Plan; Reliability; Savings leverage; and Producibility;
fLanguage
English
Journal_Title
Reliability, IEEE Transactions on
Publisher
ieee
ISSN
0018-9529
Type
jour
DOI
10.1109/TR.1987.5222391
Filename
5222391
Link To Document