DocumentCode
1357611
Title
Discussion on “mining loads for central stations” (Sykes and Bright), Pittsburgh, Pa., April 19, 1913. (see proceedings for May, 1913)
Volume
32
Issue
12
fYear
1913
Firstpage
2223
Lastpage
2233
Abstract
P. M. Lincoln: I do not think in our industry there is anything on which the members of the fraternity have more divergent opinions than they have on this question of power rate. It is somewhat difficult in the first place to obtain a proper conception of the items to include, to arrive at a proper power rate. Possibly the best way to get at it would be to consider the things which go to make up the ideal power rate. In starting out on this task it is very possible, in fact it is almost certain, that what may be an ideal power rate in my opinion may not be an ideal power rate in the opinion of some one else.
Keywords
Coal; Companies; Contracts; Instruments; Investment; Reactive power;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Proceedings of the
Publisher
ieee
ISSN
0097-2444
Type
jour
DOI
10.1109/PAIEE.1913.6660807
Filename
6660807
Link To Document