DocumentCode :
1357611
Title :
Discussion on “mining loads for central stations” (Sykes and Bright), Pittsburgh, Pa., April 19, 1913. (see proceedings for May, 1913)
Volume :
32
Issue :
12
fYear :
1913
Firstpage :
2223
Lastpage :
2233
Abstract :
P. M. Lincoln: I do not think in our industry there is anything on which the members of the fraternity have more divergent opinions than they have on this question of power rate. It is somewhat difficult in the first place to obtain a proper conception of the items to include, to arrive at a proper power rate. Possibly the best way to get at it would be to consider the things which go to make up the ideal power rate. In starting out on this task it is very possible, in fact it is almost certain, that what may be an ideal power rate in my opinion may not be an ideal power rate in the opinion of some one else.
Keywords :
Coal; Companies; Contracts; Instruments; Investment; Reactive power;
fLanguage :
English
Journal_Title :
American Institute of Electrical Engineers, Proceedings of the
Publisher :
ieee
ISSN :
0097-2444
Type :
jour
DOI :
10.1109/PAIEE.1913.6660807
Filename :
6660807
Link To Document :
بازگشت