• DocumentCode
    1358951
  • Title

    Large scale hydrothermal optimal power flow problems based on interior point nonlinear programming

  • Author

    Wei, Hau ; Sasaki, Hiroshi ; Kubokawa, Junji ; Yokoyama, Ryuichi

  • Author_Institution
    Dept. of Electr. Eng., Guangxi Univ., Nanning, China
  • Volume
    15
  • Issue
    1
  • fYear
    2000
  • fDate
    2/1/2000 12:00:00 AM
  • Firstpage
    396
  • Lastpage
    403
  • Abstract
    This paper presents an interior point algorithm for hydrothermal optimal power flow problems (HTOPF) which is derived from the perturbed KKT conditions of the primal problem. Moreover, the algorithm is extended successfully to solve approximate HTOPF problems (A-HTOPF) to find a suboptimal solution with much less execution time. For large scale systems, A-HTOPF can reduce CPU time by half and can guarantee more than 99% accuracy in most cases. By properly exchanging rows and columns of a correction equation, the reduced equation with novel 4T×4T block diagonal submatrices can be derived, where T is the number of time interval. Its topological structure is identical to that of the nodal admittance matrix, thus enabling an efficient algorithm. Numerical tests have been executed on six test systems of up to 1047 buses for HTOPF over 72 time intervals. The computational burden of the maximum test system is equal to that of 75384 (1047×72) bus OPF problem. The simulation results have verified that the proposed algorithm possesses good convergence property within reasonable execution time, and hence, the algorithm is quite promising for large scale applications
  • Keywords
    convergence of numerical methods; electric admittance; hydrothermal power systems; load flow; matrix algebra; nonlinear programming; 4T×4T block diagonal submatrices; CPU time reduction; cascade hydro plant; centering direction; convergence property; interior point nonlinear programming; large scale hydrothermal optimal power flow; nodal admittance matrix; perturbed KKT conditions; primal problem; submatrix topological structure; suboptimal solution; Admittance; Convergence; Equations; Large-scale systems; Linear programming; Load flow; Power generation economics; Power system economics; Power systems; System testing;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.852150
  • Filename
    852150