DocumentCode :
1359401
Title :
Berlin bounds from insular to integrated operations [electricity supply]
Author :
Bechtold, Klaus
Author_Institution :
Berliner Kraft- und Licht Bewag-AG, Germany
Volume :
10
Issue :
1
fYear :
1997
fDate :
1/1/1997 12:00:00 AM
Firstpage :
20
Lastpage :
25
Abstract :
After 40 years of insular operation, the Bewag electric utility is now part of the Western European power supply grid. This article looks back at the power supply situation that developed in the West and East during the post-war period and describes the measures required to establish comparable power supply conditions after unification, the integration into the western European grid system and the control system put in place to optimize operations
Keywords :
SCADA systems; electricity supply industry; history; power system control; power system interconnection; Bewag electric utility; Germany; Western European power supply grid; interconnection; power network control system; power supply conditions; Aging; Cities and towns; Cogeneration; Control systems; Heat pumps; History; Large-scale systems; Power generation; Power measurement; Power supplies;
fLanguage :
English
Journal_Title :
Computer Applications in Power, IEEE
Publisher :
ieee
ISSN :
0895-0156
Type :
jour
DOI :
10.1109/67.560816
Filename :
560816
Link To Document :
بازگشت