DocumentCode :
135953
Title :
Best phase connection for DGs using individual smart meter data
Author :
Mercier, Aurelien ; Benoit, Clementine ; Besanger, Yvon
Author_Institution :
G2Elab, Grenoble Inst. of Technol., Grenoble, France
fYear :
2014
fDate :
27-31 July 2014
Firstpage :
1
Lastpage :
5
Abstract :
This paper presents a method allowing to choose the best phase for connecting a single phase DG. The aim is to find which connection phase induces the lowest losses while avoiding overrun constraints. In that order, some weigthing function are created. A Smart Metering system has been considered, that save and transmit data consumption from customers to the operator. Various consumption periods have been considered to take into account winter and summer critical period. Finally a study case presents a LV feeder with a gradualy increasing insertion rate of DGs. A comparison is done between cases with and without optimal connection.
Keywords :
data communication; distributed power generation; energy consumption; metering; smart meters; DG; LV feeder; best phase connection; dispersed generation; individual smart meter data consumption transmission; smart metering system; weigthing function; Green products; Load flow; Mathematical model; Smart meters; Vectors; Wires; Distribution Network; GreenLys project; Optimal DG phase connection; SCADA; Smart Grid; Smart Meter;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
PES General Meeting | Conference & Exposition, 2014 IEEE
Conference_Location :
National Harbor, MD
Type :
conf
DOI :
10.1109/PESGM.2014.6939853
Filename :
6939853
Link To Document :
بازگشت