• DocumentCode
    1362312
  • Title

    Contingency-Constrained PMU Placement in Power Networks

  • Author

    Aminifar, Farrokh ; Khodaei, Amin ; Fotuhi-Firuzabad, Mahmud ; Shahidehpour, Mohammad

  • Author_Institution
    Electr. Eng. Dept., Sharif Univ. of Technol., Tehran, Iran
  • Volume
    25
  • Issue
    1
  • fYear
    2010
  • Firstpage
    516
  • Lastpage
    523
  • Abstract
    In this paper, a model for the optimal placement of contingency-constrained phasor measurement units (PMUs) in electric power networks is presented. The conventional complete observability of power networks is first formulated and then, different contingency conditions in power networks including measurement losses and line outages are added to the main model. The communication constraints which would limit the maximum number of measurements associated with each installed PMU is considered as measurement limitations. The relevant formulations are also proposed to make the model more comprehensive. The IEEE standard test systems are examined for the applicability of proposed model. The comparison of presented results with those of other methods is presented which would justify the effectiveness of proposed model with regards to minimizing the total number of PMUs and the execution time. A large-scale system with 2383 buses is also analyzed to exhibit the applicability of proposed model to practical power system cases.
  • Keywords
    linear programming; power engineering computing; power system measurement; power system simulation; contingency-constrained PMU placement; electric power networks; large-scale system; optimal placement; phasor measurement units; Contingency; integer linear programming; phasor measurement unit (PMU); transmission security;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2009.2036470
  • Filename
    5357471