    The view from the top

  • Author

    Lawhorn, John ; Osborn, Dale ; Caspary, Jay ; Nickell, Bradley ; Larson, Doug ; Lasher, Warren ; Rahman, Mosaddequr

  • Author_Institution
    Midwest ISO, St. Paul, MN, USA
  • Volume
    7
  • Issue
    6
  • fYear
    2009
  • Firstpage
    76
  • Lastpage
    88
  • Abstract
    The challenge of integrating large amounts of renewable energy resources into the electric sector requires updated transmission analysis techniques. Economic planning, primarily in the form of value-based planning over interconnection-wide areas, is needed before performing the traditional single-hour, capacity-based reliability analyses. This article looks at the transmission planning processes of leading organizations from various sectors - regional transmission organizations (RTOs), investor-owned utilities, and regional organizations-within the United States to illustrate what changes to the traditional transmission planning process are required to meet the present challenges.
  • Keywords
    power system interconnection; power transmission economics; power transmission planning; power transmission reliability; renewable energy sources; economic planning; renewable energy resources; single-hour capacity-based reliability analyses; transmission planning processes; updated transmission analysis techniques; value-based planning; Biomass; Geothermal power generation; Maintenance; Meeting planning; Performance analysis; Power generation economics; Process planning; Renewable energy resources; Solar power generation; Wind energy generation;
  • fLanguage
    English
  • Journal_Title
    Power and Energy Magazine, IEEE
  • Publisher
    ieee
  • ISSN
    1540-7977
  • Type

    jour

  • DOI
    10.1109/MPE.2009.934264
  • Filename
    5233740