    Fabrication: Chip fabricators run the `anchor leg¿ in producing a complex chip in the allotted time: They begin on day 15 and finish on day 31

  • Author

    Fischetti, Mark A.

  • Volume
    21
  • Issue
    9
  • fYear
    1984
  • Firstpage
    35
  • Lastpage
    39
  • Abstract
    Major changes will be needed in widely accepted fabrication practices to make the one-month chip a feasible attainment throughout the semiconductor industry. That fabricators can do the job in the two weeks allotted to them ¿ chip design accounts for the first two weeks ¿ is already being demonstrated by some chip manufacturers.