DocumentCode
136695
Title
The study on short circuit test for traction power supply system of Passenger dedicated Line
Author
Yong Wang
Author_Institution
China CREC Railway Electrification Bur. Group, Beijing, China
fYear
2014
fDate
Aug. 31 2014-Sept. 3 2014
Firstpage
1
Lastpage
5
Abstract
The preconditions, procedure, method and attention items of the short circuit test are studied in this paper, and the measured data and the evaluation standard are analyzed by taking the implementation in Beijing-Tianjin Passenger Dedicated Line as example, which can be the standardized reference model. Through the actual application and analyzation of Beijing-Tianjin Passenger Dedicated Line, it is confirmed that the short circuit test of traction power supply system is indispensable in the phase of integration test. The installation quality, system function and system performance of traction power supply system can be verified and optimized by means of the standardized and actual short-circuit test.
Keywords
testing; traction power supplies; Beijing-Tianjin passenger dedicated line; short circuit test; standardized reference model; traction power supply system; Circuit breakers; Circuit faults; Grounding; Impedance; Rail transportation; Rails; Wires;
fLanguage
English
Publisher
ieee
Conference_Titel
Transportation Electrification Asia-Pacific (ITEC Asia-Pacific), 2014 IEEE Conference and Expo
Conference_Location
Beijing
Print_ISBN
978-1-4799-4240-4
Type
conf
DOI
10.1109/ITEC-AP.2014.6940966
Filename
6940966
Link To Document