• DocumentCode
    1367650
  • Title

    Needed: ASAP Approach

  • Author

    Desai, Bhavin ; Lebow, Michael

  • Volume
    8
  • Issue
    6
  • fYear
    2010
  • Firstpage
    53
  • Lastpage
    60
  • Abstract
    Risk assessment and management are key elements in any well-developed asset management plan, and an increasing number of utilities are devoting resources to the tasks of improving their understanding of and capability to make risk-based decisions. Consequently, there is growing interest in the tools and methodologies required to better assess equipment performance and risk and provide quantitative information to drive asset management decision processes. In addition, risk and performance assessment tools can be integrated into smart grid implementations, turning smart-grid-generated equipment status data into information and providing timely equipment and system condition and risk exposure metrics in order to improve operating reliability efficiency. A suite of integrated risk and performance tools for substation equipment has been developed and demonstrated with the application of algorithms to power transformers and high-voltage circuit breakers.
  • Keywords
    circuit breakers; decision making; power transformers; risk management; smart power grids; ASAP approach; asset management decision processes; asset management plan; high-voltage circuit breakers; intelligent fleet management; power transformers; risk assessment; risk management; risk-based approach; risk-based decision making; smart-grid-generated equipment; Asset management; Electricity supply industry; Power system management; Power system planning; Risk management; Smart grids;
  • fLanguage
    English
  • Journal_Title
    Power and Energy Magazine, IEEE
  • Publisher
    ieee
  • ISSN
    1540-7977
  • Type

    jour

  • DOI
    10.1109/MPE.2010.938511
  • Filename
    5618511