Back on line in 72 hours: To reconnect Mexico City´s complex electric grid after last September´s earthquake, engineers zeroed in on the most critical repairs, aided by remote operation of substations
Author
Vera, J.G.
Author_Institution
Mexican Light & Power Co., Mexico
Volume
23
Issue
6
fYear
1986
fDate
6/1/1986 12:00:00 AM
Firstpage
41
Lastpage
46
Abstract
Describes the Mexican Light and Power company´s efforts to reconnect Mexico City´s complex electric grid after the September 1985 earthquake. The engineers zeroed in on the most critical repairs, aided by remote operation of substations, and restored power to the company´s 3,200,000 customers in only 72 hours. The author discusses getting accurate damage reports, keeping the work crews supplied, and work crew medical and safety factors.
Keywords
distribution networks; earthquakes; electricity supply industry; substations; Mexico City; damage reports; electric grid; power supply reconnection; safety; substations; Buildings; Cities and towns; Earthquakes; Electricity; Maintenance engineering; Power cables; Switches;
fLanguage
English
Journal_Title
Spectrum, IEEE
Publisher
ieee
ISSN
0018-9235
Type
jour
DOI
10.1109/MSPEC.1986.6370931
Filename
6370931
Link To Document