• DocumentCode
    1370921
  • Title

    Some application phases of the ignitron rectifier locomotives on the Pennsylvania Railroad

  • Author

    Brown, F. D.

  • Author_Institution
    Westinghouse Electric Corporation, Philadelphia, Pa.
  • Volume
    73
  • Issue
    3
  • fYear
    1954
  • fDate
    7/1/1954 12:00:00 AM
  • Firstpage
    128
  • Lastpage
    135
  • Abstract
    WHEN two ignitron rectifier freight locomotives (class E2C and E3B) were first put into service on the Pennsylvania Railroad (PRR) approximately 2 years ago, the event could well have been taken as marking the golden jubilee of main-line electrification in this country. Certainly their successful design and operation are a fitting tribute to those who in 1902 first took a contract to equip a high-speed railroad line with an electrification using single-phase series-type railway motors.
  • Keywords
    Acceleration; Adhesives; Force; Rails; Rectifiers; Resistance; Traction motors;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Part II: Applications and Industry, Transactions of the
  • Publisher
    ieee
  • ISSN
    0097-2185
  • Type

    jour

  • DOI
    10.1109/TAI.1954.6371369
  • Filename
    6371369