DocumentCode :
1372704
Title :
A new welder busway distribution system
Author :
Fisher, Lawrence E. ; Dailey, Robert W.
Author_Institution :
General Electric Company, Plainville, Conn.
Volume :
79
Issue :
3
fYear :
1960
fDate :
7/1/1960 12:00:00 AM
Firstpage :
203
Lastpage :
215
Abstract :
THE OHIO Stamping Plant of Chrysler. Corporation at Twinsburg, Ohio, covers an area of 1,500,000 sq ft (square feet), approximately 34 acres. Power is supplied by the Ohio Edison Company to supply the great number of motor loads and so forth for the heavy presses and other manufacturing equipment in the plant. The estimated short-circuit duty is 2,500,000 kva, based on long-range future plans. The estimated initial short-circuit duty is 600,000 kva 3 phase symmetrical.
Keywords :
Circuit breakers; Equations; Firing; Fuses; Plugs; Presses; Welding;
fLanguage :
English
Journal_Title :
American Institute of Electrical Engineers, Part II: Applications and Industry, Transactions of the
Publisher :
ieee
ISSN :
0097-2185
Type :
jour
DOI :
10.1109/TAI.1960.6371667
Filename :
6371667
Link To Document :
بازگشت