Project performance indicators of engineering design groups: Evaluation and proposed improvement
Author
Hartono, B. ; Muhamad, I.
Author_Institution
Ind. Eng. Program, Univ. Gadjah Mada, Yogyakarta, Indonesia
fYear
2014
fDate
23-25 Sept. 2014
Firstpage
140
Lastpage
144
Abstract
The study aims at investigating the current approach in utilizing project performance indicators for engineering groups within the context of engineering, procurement, and construction (EPC) project. A systems dynamics methodology is utilized and an EPC project of developing a geothermal power plant is observed. The result confirms a common wisdom that the underlying assumption utilized by current assessment methods does not reflect an accurate assessment of group or departmental performance. This is due to systemic errors beyond the scope of the particular department. A proposed model is developed to assist the adjustment of project schedule baseline. It considers systemic effects hence provide a more accurate performance evaluation model.
Keywords
geothermal power stations; procurement; project management; EPC project; departmental performance assessment; engineering design groups; engineering-procurement-and-construction project; geothermal power plant development; group performance assessment; performance evaluation model; project performance indicators; project schedule baseline; system dynamics methodology; systemic errors; Adaptation models; Data models; Power generation; Procurement; Project management; Schedules; Testing; EPC; projects; schedule performance indicators; systems dynamics;
fLanguage
English
Publisher
ieee
Conference_Titel
Management of Innovation and Technology (ICMIT), 2014 IEEE International Conference on
Conference_Location
Singapore
Type
conf
DOI
10.1109/ICMIT.2014.6942415
Filename
6942415
Link To Document