• DocumentCode
    1387074
  • Title

    The development of communication, indication and telemetering equipment for the British grid

  • Author

    Burns, G.A. ; Fletcher, F. ; Chambers, C.H. ; Gunning, P.F.

  • Volume
    105
  • Issue
    24
  • fYear
    1958
  • fDate
    12/1/1958 12:00:00 AM
  • Firstpage
    565
  • Lastpage
    574
  • Abstract
    The development of a `standardized system¿ of communication, indication and telemetering to control the British Grid was started in 1949 by certain telephone manufacturers and the then British Electricity Authority. The system is now in full operation in all Grid control areas of the Central Electricity Generating Board. The paper explains some of its design features. The facilities and services it affords are described in the companion paper.6 The methods employed in transmitting general indications and instructions over the rented Grid control networks, between Grid Control Centres and stations in the control areas, are explained, and the paper shows how group working is catered for by satellite and minor-station equipment and how unattended minor stations are controlled from associated major stations. The design of the telephone system, which caters for administration as well as Grid control traffic, is explained in some detail, as also is the telemetering system with its initiating devices, miscellaneous instruments and arrangements for telemeter summation and retransmission. The paper concludes with a description of power supplies, testing facilities, alarms and general equipment.
  • Keywords
    power transmission; telecontrol; telemetry;
  • fLanguage
    English
  • Journal_Title
    Proceedings of the IEE - Part A: Power Engineering
  • Publisher
    iet
  • ISSN
    0369-8882
  • Type

    jour

  • DOI
    10.1049/pi-a.1958.0106
  • Filename
    5242141