• DocumentCode
    1388753
  • Title

    Coordination between long-term and short-term generation scheduling with network constraints

  • Author

    Marwali, M.K.C. ; Shahidehpour, S.M.

  • Author_Institution
    Dept. of Electr. & Comput. Eng., Illinois Inst. of Technol., Chicago, IL, USA
  • Volume
    15
  • Issue
    3
  • fYear
    2000
  • fDate
    8/1/2000 12:00:00 AM
  • Firstpage
    1161
  • Lastpage
    1167
  • Abstract
    This paper discusses the coordination between long-term and short-term generation scheduling. The minimum energy reserve in the system is used as a performance index for short-term generation scheduling. If the short-term solution is unsatisfactory, the long-term schedule will be adjusted to satisfy the short-term scheduling requirements. The presence of network constraints impacts the scheduling solution. The proposed approach is tested on the IEEE RTS
  • Keywords
    Monte Carlo methods; maintenance engineering; power generation planning; power generation scheduling; power system analysis computing; IEEE RTS; computer simulation; long-term/short-term generation scheduling coordination; minimum energy reserve; network constraints; performance index; power systems; scheduling requirements; Costs; Couplings; Fuels; Helium; Maintenance; Performance analysis; Power transmission lines; Real time systems; Sociotechnical systems; Testing;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.871749
  • Filename
    871749