DocumentCode :
1389385
Title :
An Experimental Comparison of Production Planning Using Clearing Functions and Iterative Linear Programming-Simulation Algorithms
Author :
Kacar, Necip Baris ; Irdem, Durmus Fatih ; Uzsoy, Reha
Author_Institution :
Edward P. Fitts Dept. of Ind. & Syst. Eng., North Carolina State Univ., Raleigh, NC, USA
Volume :
25
Issue :
1
fYear :
2012
Firstpage :
104
Lastpage :
117
Abstract :
We compare the performance of three algorithms for production planning with workload-dependent lead times. These include a clearing function model using two different methods for estimating the clearing functions, and two iterative algorithms that combine linear programming and simulation models. Our experimental comparison uses a simulation model of a re-entrant bottleneck system built with attributes of a real-world semiconductor fabrication environment. We vary the bottleneck utilization, demand patterns, the mean time to failure, and the mean time to repair. Results indicate that the clearing function model performs better than the iterative algorithms on the scaled-down system considered, giving less variable production plans and higher profit values.
Keywords :
iterative methods; linear programming; production planning; semiconductor device manufacture; clearing function model; iterative linear programming simulation algorithms; production planning; real-world semiconductor fabrication environment; reentrant bottleneck system; workload dependent lead times; Computational modeling; Mathematical model; Planning; Production planning; Semiconductor device modeling; Clearing function; linear programming (LP); production planning; simulation; workload-dependent lead times;
fLanguage :
English
Journal_Title :
Semiconductor Manufacturing, IEEE Transactions on
Publisher :
ieee
ISSN :
0894-6507
Type :
jour
DOI :
10.1109/TSM.2011.2176560
Filename :
6095380
Link To Document :
بازگشت