Addressing the Technical Challenges for the Construction of the ITER Central Solenoid
Author :
Libeyre, P. ; Bessette, D. ; Jewell, M. ; Jong, C. ; Lyraud, C. ; Rodriguez-Mateos, Felix ; Hamada, Kazuya ; Reiersen, W. ; Martovetsky, N. ; Rey, C. ; Hussung, R. ; Litherland, S. ; Freudenberg, K. ; Myatt, L. ; Dalder, E. ; Reed, Robert ; Sgobba, S.
Author_Institution :
ITER Organ., St. Paul-lez-Durance, France
Volume :
22
Issue :
3
fYear :
2012
fDate :
6/1/2012 12:00:00 AM
Firstpage :
4201104
Lastpage :
4201104
Abstract :
The Central Solenoid (CS) of the ITER Magnet system is split into six independently powered coils enclosed inside an external structure which provides vertical precompression thus preventing separation of the coils and acting as a support to net resulting loads. The analyses include an assessment of the mechanical behavior of the different components of the CS, under the normal and fault conditions, aiming at demonstrating the ability of the CS to achieve 30 000 cycles of plasma operation at nominal current (15 MA). A comprehensive material testing program is developed for the conductor jacket, the impregnated glass-epoxy insulation and the structure. The paper describes the architecture of the analysis and qualification programs and provides an overview of the results obtained so far.
Keywords :
epoxy insulation; superconducting coils; superconducting magnets; ITER central solenoid; ITER magnet system; conductor jacket; current 15 MA; impregnated glass-epoxy insulation; material testing; plasma operation; Coils; Conductors; Insulation; Materials; Solenoids; Welding; Windings; Material testing; mechanical analysis; qualification; superconducting coil;
fLanguage :
English
Journal_Title :
Applied Superconductivity, IEEE Transactions on
Publisher :
ieee
ISSN :
1051-8223
Type :
jour
DOI :
10.1109/TASC.2011.2178054
Filename :
6107559
Link To Document :
بازگشت