• DocumentCode
    1405182
  • Title

    The calculation of cyclic rating factors and emergency loading for one or more cables laid direct or in ducts

  • Author

    Goldenberg, H.

  • Volume
    105
  • Issue
    7
  • fYear
    1958
  • fDate
    3/1/1958 12:00:00 AM
  • Firstpage
    46
  • Lastpage
    54
  • Abstract
    The knowledge of the loss load factor of a load cyclically applied to a cable laid direct in the ground or in a duct, together with the detail of the load current for the six hours prior to maximum core temperature, is shown to be adequate for cyclic-rating-factor calculations. If the loss load factor is known without further calculation, the method is shorter than an earlier one described by the author. The method is extended to deal with short-term emergency loads within accepted temperature limits and with groups of cables carrying diverse cyclic loads.
  • Keywords
    power cables; underground cables;
  • fLanguage
    English
  • Journal_Title
    Proceedings of the IEE - Part C: Monographs
  • Publisher
    iet
  • ISSN
    0369-8904
  • Type

    jour

  • DOI
    10.1049/pi-c.1958.0008
  • Filename
    5245455