Abstract :
The knowledge of the loss load factor of a load cyclically applied to a cable laid direct in the ground or in a duct, together with the detail of the load current for the six hours prior to maximum core temperature, is shown to be adequate for cyclic-rating-factor calculations. If the loss load factor is known without further calculation, the method is shorter than an earlier one described by the author. The method is extended to deal with short-term emergency loads within accepted temperature limits and with groups of cables carrying diverse cyclic loads.