DocumentCode
1405182
Title
The calculation of cyclic rating factors and emergency loading for one or more cables laid direct or in ducts
Author
Goldenberg, H.
Volume
105
Issue
7
fYear
1958
fDate
3/1/1958 12:00:00 AM
Firstpage
46
Lastpage
54
Abstract
The knowledge of the loss load factor of a load cyclically applied to a cable laid direct in the ground or in a duct, together with the detail of the load current for the six hours prior to maximum core temperature, is shown to be adequate for cyclic-rating-factor calculations. If the loss load factor is known without further calculation, the method is shorter than an earlier one described by the author. The method is extended to deal with short-term emergency loads within accepted temperature limits and with groups of cables carrying diverse cyclic loads.
Keywords
power cables; underground cables;
fLanguage
English
Journal_Title
Proceedings of the IEE - Part C: Monographs
Publisher
iet
ISSN
0369-8904
Type
jour
DOI
10.1049/pi-c.1958.0008
Filename
5245455
Link To Document