DocumentCode
1406757
Title
Preparing substations for electric operation
Author
Curtis, L. B.
Author_Institution
Pennsylvania Railroad, Philadelphia, Pa.
Volume
51
Issue
1
fYear
1932
Firstpage
47
Lastpage
47
Abstract
APPROXIMATELY forty substations are involved in the extensive electrification program recently announced for the Pennsylvania Railroad between New York and Washington; eleven of these already are in operation. A definite program for testing these substations before they are placed in operation has been evolved, and this procedure has been combined into a single set of test instructions.
Keywords
DC motors; Generators; Induction motors; Rotors; Substations; Synchronous motors; Windings;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1932.6429629
Filename
6429629
Link To Document