• DocumentCode
    1407965
  • Title

    Development of the Waukegan station

  • Author

    Hecht, J. L.

  • Volume
    51
  • Issue
    6
  • fYear
    1932
  • fDate
    6/1/1932 12:00:00 AM
  • Firstpage
    391
  • Lastpage
    393
  • Abstract
    The reasons for the development, choice of site, and general plan of the Waukegan station are outlined briefly in this article. The three major periods of development are covered, the article serving as an introduction to the two companion articles “Waukegan Features New Electrical Design” and “A 115,000-Kw. Turbo-Alternator,” which follow.
  • Keywords
    Boilers; Coal; Companies; Lakes; Power generation; Switches; Switchgear;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1932.6429827
  • Filename
    6429827