Title :
Segregation of hydroelectric power costs
Author_Institution :
Department of Public Works, State of Washington, Olympia
Abstract :
THE PRODUCTION COST of electric power is made up of the power or demand cost per kilowatt and the energy cost per kilowatt-hour. The relative amount of each of these items which make up the total cost of power at the power station determines the cost at any load factor. The above segregation of the annual production cost of power is essential in determining the power rates and the economic design of the production plants of an electric system.
Keywords :
Abstracts; Companies; Power generation; Power supplies; Production; Schedules;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1932.6429941