DocumentCode
1408683
Title
Electrical operation on the cascade division of the Great Northern Railway
Author
Cox, J. B.
Author_Institution
General Electric Company, Erie, Pa.
Volume
51
Issue
8
fYear
1932
Firstpage
584
Lastpage
584
Abstract
ELECTRIFICATION of the Great Northern Railway´s main line between Skykomish and Wenatchee, 73 route miles, was carried out in conjunction with the building of a new tunnel 7.79 miles long, and the relocation of approximately 17 route miles of troublesome track and other minor improvements, aggregating an expenditure of approximately $25,500,000. Although all of these improvements were placed in operation at about the same time, making a direct comparison of operating expenses difficult, analyses which give a reliable comparison between the cost of steam and electric operation over this part of the system have been made.
Keywords
Current transformers; Magnetic cores; Magnetic flux; Magnetization; Power transmission lines; Relays; Voltage transformers;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1932.6429943
Filename
6429943
Link To Document