• DocumentCode
    1408683
  • Title

    Electrical operation on the cascade division of the Great Northern Railway

  • Author

    Cox, J. B.

  • Author_Institution
    General Electric Company, Erie, Pa.
  • Volume
    51
  • Issue
    8
  • fYear
    1932
  • Firstpage
    584
  • Lastpage
    584
  • Abstract
    ELECTRIFICATION of the Great Northern Railway´s main line between Skykomish and Wenatchee, 73 route miles, was carried out in conjunction with the building of a new tunnel 7.79 miles long, and the relocation of approximately 17 route miles of troublesome track and other minor improvements, aggregating an expenditure of approximately $25,500,000. Although all of these improvements were placed in operation at about the same time, making a direct comparison of operating expenses difficult, analyses which give a reliable comparison between the cost of steam and electric operation over this part of the system have been made.
  • Keywords
    Current transformers; Magnetic cores; Magnetic flux; Magnetization; Power transmission lines; Relays; Voltage transformers;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1932.6429943
  • Filename
    6429943