• DocumentCode
    1408924
  • Title

    The rock Island hydroelectric development

  • Author

    Newberry, A. P. ; Sears, George C.

  • Author_Institution
    Both of Puget Sound Power & Light Co., Seattle, Wash.
  • Volume
    51
  • Issue
    9
  • fYear
    1932
  • Firstpage
    654
  • Lastpage
    659
  • Abstract
    First electric power development on the famous Columbia River, the initial 60,000-kw Rock Island plant also is the first major low head installation on the Pacific Coast, a territory Ions famous for its high head plants, and has the largest installed capacity in adjustable-vane propeller-type wheels of any plant in the United States. Some of the project´s many departures from conventional design are revealed in the accompanying text and illustrations.
  • Keywords
    Concrete; Generators; Logic gates; Magnetic heads; Rivers; Rocks; Wheels;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1932.6429983
  • Filename
    6429983