  • Title

    115-Kv submarine cable for Columbia river crossing

  • Author

    Pearson, E. F. ; Shanklin, G. B. ; Bullard, W. R. ; Clark, S. B.

  • Author_Institution
    Northwestern Electric Company, Portland, Ore.
  • Volume
    51
  • Issue
    10
  • fYear
    1932
  • Firstpage
    685
  • Lastpage
    693
  • Abstract
    Outstanding among cable installations is the recently completed 115-kv oil filled submarine cable which crosses the Columbia River between the states of Washington and Oregon. Three single-conductor hollow-core 750,000-cir-mil cables having armor wires of hard drawn copper instead of steel, are laid directly on the bed of the river 4 ft apart, and cross 2 channels of the river, 3,460 and 1,360 ft in width. These crossings are connected by an overhead transmission line. A 33-ft maximum difference in the water level of the river necessitated the solution of a number of problems at this installation. The many interesting features are described in this article, which is divided into 4 main sections. The first section describes the general reasons for the principal decisions regarding the cable, the second describes the specifications and manufacture, the third describes the design of the field installation, and the fourth covers installation and construction methods. Each section contributes valuable information in its respective field.
  • Keywords
    Conductors; Oil filled cables; Power cables; Reservoirs; Rivers; Underwater cables; Valves;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1932.6430013
  • Filename
    6430013