Influence of Environmental Constraints on Profit-Based Short-Term Thermal Scheduling
Author :
Catalão, J. P S ; Mendes, V.M.F.
Author_Institution :
Univ. of Beira Interior, Covilha, Portugal
Volume :
2
Issue :
2
fYear :
2011
fDate :
4/1/2011 12:00:00 AM
Firstpage :
131
Lastpage :
138
Abstract :
This paper is on the short-term thermal scheduling (STTS) problem, particularly concerning the new competitive and environmentally constrained electricity supply industry. On the one hand, within the electricity market, STTS has evolved from a minimum-cost policy in state-owned monopolistic companies to a profit-based policy under market conditions. On the other hand, as a consequence of growing environmental concerns, an unprecedented change points to a scenario where it is necessary to take into account the constraints related to the environment. We propose a multiobjective optimization (MO) approach to solve the profit-based STTS problem with environmental concerns. Two case studies are considered: the IEEE 30-bus system and a 75-bus system. Finally, conclusions are duly drawn.
Keywords :
environmental economics; optimisation; power generation economics; power generation scheduling; power markets; thermal power stations; IEEE 30-bus system; electricity market; environmental constrain electricity supply industry; minimum-cost policy; multiobjective optimization approach; profit-based STTS problem; profit-based short-term thermal scheduling; state-owned monopolistic company; Emission; multiobjective optimization (MO); power generation dispatch; profit;
fLanguage :
English
Journal_Title :
Sustainable Energy, IEEE Transactions on
Publisher :
ieee
ISSN :
1949-3029
Type :
jour
DOI :
10.1109/TSTE.2010.2101088
Filename :
5672621
Link To Document :
بازگشت