Title :
Case history of a cost effective design approach for for laterally loaded drilled shafts
Author :
Kondziolka, R.E. ; Rojas-Gonzalez, L.F.
fDate :
1/1/1991 12:00:00 AM
Keywords :
Computer aided software engineering; Concrete; Cost function; Power transmission lines; Shafts; Soil; Standardization; Steel;
Journal_Title :
Power Engineering Review, IEEE
DOI :
10.1109/MPER.1991.88682