Title :
Automatic operator improves efficiency
Author_Institution :
I. P. Morris & De La Vergne, Inc., Philadelphia
Abstract :
Because the burdensome detail of maintaining accurately predetermined loading schedules is more than present-day minimized operating forces can handle, seldom are hydroelectric generating stations operated at maximum efficiency when under manual control; automatic control equipment subject to manual regulation solves the problem.
Keywords :
Availability; Companies; Economics; Loading; Maintenance engineering; Schedules; Standards;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1931.6430134