DocumentCode :
1414828
Title :
Method for economic secure loading of a power system
Author :
Wells, D.W.
Author_Institution :
CEGB, Central Electricity Research Laboratories, Leatherhead, UK
Volume :
115
Issue :
8
fYear :
1968
fDate :
8/1/1968 12:00:00 AM
Firstpage :
1190
Lastpage :
1194
Abstract :
A procedure is described for determining the most economical schedule, consistent with network security requirements, for loading plant in a power system. Conventional methods require excessive calculation time and computer storage, which render them impracticable for online computer control; these difficulties are overcome by using a linear-programming procedure utilising a modified form of the simplex method. This modified method enables the network relationships to be used to reduce the computation and storage required. With currently available computers such as the IBM 7094, the method is applicable to systems up to the size of a Grid control area.
fLanguage :
English
Journal_Title :
Electrical Engineers, Proceedings of the Institution of
Publisher :
iet
ISSN :
0020-3270
Type :
jour
DOI :
10.1049/piee.1968.0210
Filename :
5248182
Link To Document :
بازگشت