• DocumentCode
    1415763
  • Title

    Development of the equipment required for the loading of turbogenerators under automatic power-system control

  • Author

    Moran, F. ; Bain, D.K.S. ; Sohal, J.S.

  • Author_Institution
    CEGB, Central Electricity Research Laboratories, Leatherhead, UK
  • Volume
    115
  • Issue
    7
  • fYear
    1968
  • fDate
    7/1/1968 12:00:00 AM
  • Firstpage
    1067
  • Lastpage
    1075
  • Abstract
    The experimental automatic load-dispatching system installed by the CEGB utilises a process-control computer at the Grid control centre from which loading instructions are transmitted to the generating stations. There they are automatically implemented by machine controllers that directly control the outputs of the turbogenerators. The paper covers the specification, procurement, testing and operational evaluation of the controllers. It opens with a summary of the functional requirements for the equipment, these being, briefly, the combination of linear control between predicted load targets with a chosen degree of compensation for system-frequency deviations. The main features of the equipment provided and a summary of the tests carried out to determine its control characteristics are then given. An analysis follows of the operational problems arising in the stations from the application of this form of automatic system control, and it is concluded that the main difficulties stem from the lack of adequate warning of the faster load changes. The lessons learnt are embodied in the concluding Section, which summarises the likely requirements for any future station installations.
  • fLanguage
    English
  • Journal_Title
    Electrical Engineers, Proceedings of the Institution of
  • Publisher
    iet
  • ISSN
    0020-3270
  • Type

    jour

  • DOI
    10.1049/piee.1968.0190
  • Filename
    5248331