Title :
Co-ordination of power transformers for steep-front impulse waves
Author :
Montsinger, V. M.
Author_Institution :
General Electric Company, Pittsfield, Mass.
fDate :
4/1/1938 12:00:00 AM
Abstract :
THE REQUIREMENT that transformers withstand certain specified impulse tests has been accepted by the industry as desirable, and the Institute has recommended a standard method of testing transformers with a 1.5 × 40 microsecond wave.
Keywords :
Corona; Oil insulation; Power transformer insulation; Testing;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1938.6431233