• DocumentCode
    1417730
  • Title

    An integrated system of metropolitan electricity supply. Experiences in design

  • Author

    Milne, A.G. ; Maltby, J.H.

  • Author_Institution
    South Eastern Electricity Board, Hove, UK
  • Volume
    114
  • Issue
    6
  • fYear
    1967
  • fDate
    6/1/1967 12:00:00 AM
  • Firstpage
    745
  • Lastpage
    754
  • Abstract
    The paper describes the development, design and costs of the London Electricity Board´s supply system since nationalisation. Information is given on the pattern of demand and load densities. Methods and aims in use since nationalisation and before are reviewed against the objective of a specific code of reliability as well as a prospective fourfold increase in future consumer demands. Alternative methods of supply have been examined alongside the experience of one in increasing use over the past 30 years. Reasons are given for the adoption, for the future, of designs based on present practices. Explanations are given for such modifications as are seen necessary for meeting, with long-term economy, the demands now in prospect.
  • Keywords
    distribution networks;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineers, Proceedings of the Institution of
  • Publisher
    iet
  • ISSN
    0020-3270
  • Type

    jour

  • DOI
    10.1049/piee.1967.0146
  • Filename
    5248649