Author_Institution :
Southern California Edison Company, Ltd., Los Angeles, Calif.
Abstract :
To transmit its allotment of power from Boulder Dam to its system, the Southern California Edison Company, Ltd., has completed and recently placed in operation a 233-mile, single-circuit, 220-kv line of simple and time-tested design, the principal features of which are here outlined.