DocumentCode
1419289
Title
II — Hurricane experiences of the railroads
Author
Withington, Sidney
Author_Institution
New York, New Haven and Hartford Railroad Company, New Haven, Conn.
Volume
58
Issue
3
fYear
1939
fDate
3/1/1939 12:00:00 AM
Firstpage
102
Lastpage
104
Abstract
THE railroad appurtenances chiefly affected by the storms were: tracks, bridges, passenger and freight station buildings, signals, electric power generating, transmission, and distribution facilities, communication lines, and miscellaneous motors, such as shop, pump, floatbridge and track-switch motors, and drawbridge motors and control circuits. Various types of buildings, boats of all sizes, including a large lighthouse tender which required 17 days to remove, and other debris of all kinds deposited on the tracks, contributed relatively minor but still important problems in restoration of service. Busy passenger stations, such as that at Providence, R. I., and at New London, Conn., having been inundated, were without lights for a time. The railroad organizations thus lacked nothing of variety in re-establishing service.
Keywords
Bridge circuits; Bridges; Buildings; Power systems; Rivers; Storms; Terrain factors;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1939.6431798
Filename
6431798
Link To Document