• DocumentCode
    1421325
  • Title

    Bushing and associated insulation testing by the power-factor method

  • Author

    Baltzly, C. C. ; Schlottere, E. L.

  • Author_Institution
    Philadelphia Electric Company, Philadelphia, Pa.
  • Volume
    60
  • Issue
    6
  • fYear
    1941
  • fDate
    6/1/1941 12:00:00 AM
  • Firstpage
    308
  • Lastpage
    312
  • Abstract
    The periodic cleaning, inspection, and testing of equipment plays a very important part in obtaining service continuity. The cost of the labor and equipment involved in locating and eliminating defective apparatus by the above procedure may well be charged to that hypothetical account known as “preventive maintenance.” The economics of the procedure, however, must be governed by the results obtained.
  • Keywords
    Compounds; Instrument transformers; Insulators; Power transformers; Reactive power; Testing;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1941.6432156
  • Filename
    6432156