Title :
Bushing and associated insulation testing by the power-factor method
Author :
Baltzly, C. C. ; Schlottere, E. L.
Author_Institution :
Philadelphia Electric Company, Philadelphia, Pa.
fDate :
6/1/1941 12:00:00 AM
Abstract :
The periodic cleaning, inspection, and testing of equipment plays a very important part in obtaining service continuity. The cost of the labor and equipment involved in locating and eliminating defective apparatus by the above procedure may well be charged to that hypothetical account known as “preventive maintenance.” The economics of the procedure, however, must be governed by the results obtained.
Keywords :
Compounds; Instrument transformers; Insulators; Power transformers; Reactive power; Testing;
Journal_Title :
Electrical Engineering
DOI :
10.1109/EE.1941.6432156