DocumentCode
1421325
Title
Bushing and associated insulation testing by the power-factor method
Author
Baltzly, C. C. ; Schlottere, E. L.
Author_Institution
Philadelphia Electric Company, Philadelphia, Pa.
Volume
60
Issue
6
fYear
1941
fDate
6/1/1941 12:00:00 AM
Firstpage
308
Lastpage
312
Abstract
The periodic cleaning, inspection, and testing of equipment plays a very important part in obtaining service continuity. The cost of the labor and equipment involved in locating and eliminating defective apparatus by the above procedure may well be charged to that hypothetical account known as “preventive maintenance.” The economics of the procedure, however, must be governed by the results obtained.
Keywords
Compounds; Instrument transformers; Insulators; Power transformers; Reactive power; Testing;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1941.6432156
Filename
6432156
Link To Document