DocumentCode :
1421325
Title :
Bushing and associated insulation testing by the power-factor method
Author :
Baltzly, C. C. ; Schlottere, E. L.
Author_Institution :
Philadelphia Electric Company, Philadelphia, Pa.
Volume :
60
Issue :
6
fYear :
1941
fDate :
6/1/1941 12:00:00 AM
Firstpage :
308
Lastpage :
312
Abstract :
The periodic cleaning, inspection, and testing of equipment plays a very important part in obtaining service continuity. The cost of the labor and equipment involved in locating and eliminating defective apparatus by the above procedure may well be charged to that hypothetical account known as “preventive maintenance.” The economics of the procedure, however, must be governed by the results obtained.
Keywords :
Compounds; Instrument transformers; Insulators; Power transformers; Reactive power; Testing;
fLanguage :
English
Journal_Title :
Electrical Engineering
Publisher :
ieee
ISSN :
0095-9197
Type :
jour
DOI :
10.1109/EE.1941.6432156
Filename :
6432156
Link To Document :
بازگشت