• DocumentCode
    142173
  • Title

    A study of BESS application for the diferral of power distribution system investment

  • Author

    Wannasut, Chanikkanan ; Hongesombut, Komsan

  • Author_Institution
    Dept. of Electr. Eng., Kasetsart Univ., Bangkok, Thailand
  • Volume
    3
  • fYear
    2014
  • fDate
    26-28 April 2014
  • Firstpage
    1624
  • Lastpage
    1628
  • Abstract
    This paper focuses on the study of the application of the battery energy storage system (BESS) installation instead of the distribution line reinforcement for a short-term planning. The economical tool such as Net Present Value (NPV) will be employed for cost comparison of both alternatives. The 22kV distribution network of the Provincial Electric Authority, Thailand was used as a case study. From the study, it reveals that the problems of overloaded line occurring in the short-time period per day (<;6hr) can be reduced by the BESS installation. It is also shown that this approach is applied to postpone the system reinforcement in a short-term planning (3 years) but not applicable for the long-term planning (over 5 years).
  • Keywords
    battery storage plants; investment; power distribution economics; power distribution planning; BESS application; NPV; Provincial Electric Authority; Thailand; battery energy storage system installation; net present value; power distribution system investment; short-term planning; Batteries; Economics; Electrical engineering; Investment; Load flow; Power generation; battery energy storage system; net present value; renewable energy resource;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Science, Electronics and Electrical Engineering (ISEEE), 2014 International Conference on
  • Conference_Location
    Sapporo
  • Print_ISBN
    978-1-4799-3196-5
  • Type

    conf

  • DOI
    10.1109/InfoSEEE.2014.6946196
  • Filename
    6946196